TAMPING OF FOUNDATIONS

Drilling from the center of the structure

“Distance from the wall [cm]” – by this much distance from the wall

“Angle” – drill at this angle

“Length of the lance in the ground and foundation [cm]” – the total length of the lance in the foundation and the ground, remember to add a minimum of 10cm in order to be able to carry out injections

If you are going to inject lances into deeper areas of soil under the same area (number 2 and 3), carry out the calculation a second and third time by recording the results.

Drilling from the outside of the structure from the ground side

Follow the same procedure as for drilling from the center of the structure

These calculations are in accordance with the current state of our knowledge and experience. The calculations, information and explanations contained herein are non-binding. Since we are not aware of the exact technical conditions of a particular object, the data and information contained herein do not relieve the user of the product from carrying out his own research and tests on the execution of work under specific conditions. Thus, the data contained in the calculations do not constitute a guarantee for a specific purpose. Compliance with the regulations and application requirements is the responsibility of the user.