INJECTION WORK PLANNING

Injection material consumption

Estimate resin, packers and cleaner. See how consumption is distributed and download the assumptions and result as a PDF.

01 · Structure

Total length of the section included in the calculation.

Approximate average width, not the maximum opening.

The model assumes crack filling through the entire thickness.

02 · Holes and packers

To be configured

Choose drilling geometry and spacing to calculate the packer count and hole volume.

03 · Pump and cleaning

To be configured

Set hose length and the number of cleaning cycles. You can check or enter the remaining parameters yourself.

04 · Allowance

Enter 0 if no allowance is assumed. Calculated from crack and hole filling, excluding pump losses. Select according to the site assessment.

MATERIAL BALANCE

Where does the resin go?

Enter structure and hole data. Pump parameters are examples — adapt them to your equipment.

This is a geometric estimate, not a guarantee of consumption. The model assumes a continuous gap of average width and full cylindrical holes. It does not deduct packer volume or hole intersections with the crack; it does not account for material expansion. Hidden voids and leakage may change the result. Select cleaner for the material and pump.

Holes and packers

Answer the questions. The drawing shows the entry point and hole path.

Value taken from the first section. Changes also apply to the crack volume.

Angle measured from the structure surface.

Percentage of structure thickness at which the hole should intersect the crack. 50% means halfway through.

Drill bit diameter, not the packer's nominal diameter.

Enter the distance in centimetres, measured along the crack to the next hole on the opposite side.

or

This is a starting point. If material does not reach the next port, reduce the spacing. Easy transfer may allow wider spacing.

Measure along the drill bit from the crack intersection.

Full crack drilling calculator →

Pump and cleaning

Each cycle means losing the contents of the pump and hose.

Example values must be checked: hose internal diameter 4.7 mm, pump 0.1 L, additional flushing 0.5 L per cycle.

Pump, hose and flushing parameters

Check your hose's actual diameter.

Pump volume only, excluding the hose.

Cleaner per cycle = system volume + this additional quantity.

WORK ESTIMATE · NO PERSONAL DATA

Materials, labour and travel

Select materials and enter your own rates. The document is created locally in your browser. Do not enter customer or contractor details — the PDF leaves blank spaces to complete outside the website.

1. Products to include

Product selection does not change the consumption model. Choose it for the application. Quantity is given in litres, without conversion to packs or allowance for expansion.

2. Labour cost

Each pricing method retains its own rate.

All amounts in this calculation are treated as net. Taxes are not added.

3. Crew and working time — hourly pricing

Crew time is calculated by dividing total labour input by the number of workers. We assume parallel work. A larger crew does not automatically shorten process waiting times.

How long does it take to complete 1 metre?

Example: 2 people × 30 minutes = 1 worker-hour per metre.

Preparation and clean-up for the entire job

Enter a one-off duration for the entire job. Leave 0 if it is already included in the time per metre.

Travel

Enable if you add vehicle costs or workers' travel time. Leave disabled if travel is already included in the agreed price.

Other costs and notes

Each item: name, quantity and net unit price. For example, equipment hire: 2 days × PLN 150.

Estimate summary

Materials are not included in labour costs. The document is not a complete quotation or order. Per-metre and lump-sum pricing do not charge separately for time. Hourly pricing charges worker-hours for work and travel by the whole crew. Vehicle cost is calculated separately.