Next packer: spacing of 50% of the structure thickness
Start with spacing along the crack equal to 50% of the wall or slab thickness. Place the next packer on the opposite side of the crack. Example: 20 cm concrete thickness → the next point 10 cm further along the crack, with points on the same side every 20 cm. This is port spacing, not crack intersection depth.

