PIPE PENETRATION SEALING

Penetration calculator

Measure the space around the pipe. Calculate injection material and CrackOn.5 mortar for sealing the penetration separately.

Where is the penetration?

The selection shows injection and monitoring methods. Dimensions are retained — check seal thicknesses for the selected position. Illustrations show the principle, not a borehole plan.

Penetration dimensions

Measure the hole or the inside of the sleeve. Do not enter the sleeve's outside diameter.

Measure the outer pipe surface, not its bore. Pipe Ø110 mm → enter 11 cm.

Along the pipe, from the start to the end of the repair. Also includes cementitious seals.

Sealing before injection

Mortar depth from the accessible face. Enter the dimension from the selected method; 0 means no layer in this model.

Enter 0 if you are not forming a rear mortar seal. Do not count an existing barrier as new mortar.

Additional CrackOn.5 patch around the penetration

If sealing a wider area around the penetration, enter rectangular patch width, height and thickness in cm. The hole is assumed to lie entirely inside the patch. Without an additional patch, leave all three fields at 0.

Outside width of the rectangular patch, with the hole inside.

Outside patch height. We automatically subtract the circular hole area to avoid counting it twice.

A layer on the structure's surface, outside length L. We do not subtract it from injection volume.

Quantity and allowance

Calculate penetrations with different dimensions separately.

Additional to the space volume. Enter your own allowance or 0.

Additional to seal volume. Example value — adapt it to the works.

Model: one pipe in a round hole, with constant diameters and a continuous free space. You enter seal thicknesses yourself — they are not installation recommendations.

WHERE TO MEASURE?

Space around the pipe

Resin / gelCrackOn.5Pipe

The diagram shows an ideal annular space. Length and diameter scales are independent. It does not show borehole paths or hidden voids.

How do we calculate it, and where do the assumptions come from?

Free-space area A = π × (D² − d²) / 4. Injection volume = A × (L − a − b). Seal volume = A × (a + b). Enter all dimensions in cm; 1 litre = 1000 cm³. Additional patch: (width × height − π × D² / 4) × thickness / 1000 gives litres of mortar outside the hole. Seals are subtracted from the space for injection.

CrackOn.5: approx. 7.5 l of fresh mortar from 15 kg of dry mix, or approx. 2 kg/l.

This is a geometric estimate, not guaranteed consumption. It excludes cavities, pump losses, injection holes, resin expansion and additional surface repairs. We do not determine resin kilograms without specific material data. No mortar layer in the model does not mean the surface can remain open during injection.

METHOD FROM THE RESINBAU CATALOGUE · PAGE 24

Preparation, sealing and injection

Clean the surface
01
Clean the surface

Remove contamination and loose fragments around the pipe.

Drill boreholes
02
Drill boreholes

Prepare injection and observation holes around the penetration.

Flush the holes
03
Flush the holes

Clean boreholes before installing packers.

Seal the surface
04
Seal the surface

Form a CrackOn.5 seal, leaving ports clear.

05
Inject and observe discharge

Inject material through the injection packer. Observe material appearing in the open observation packer.

Close the port and complete sealing
06
Close the port and complete sealing

After confirming communication, close the observation port and continue injection according to the material method. Check watertightness.

CrackOn.5 seals the surface, while injection material fills the space behind the seal.

THE SAME PENETRATION · A DIFFERENT FILLING DIRECTION

Floor and ceiling — where to inject material?

In addition to penetration access, an air escape path is required. The illustrations below show filling principles, not a ready-made borehole plan.

Floor / floor finish · access from above

Floor: arrow 1 indicates pouring from a bucket around the pipe; arrow 2 indicates the material level to monitor
1 Injection2 Level monitoring
  • Seal the bottom of the spaceso material does not escape below the slab.
  • Apply from above around the pipeleaving an air escape path.
  • Monitor the level and top up the entire accessible space.

The gravity option requires access from above, a sealed base and a material approved for this application. A floor location alone does not mean injection can be omitted.

Ceiling / slab soffit · access from below

Ceiling: arrow 1 indicates the left injection packer; arrow 2 indicates a drop at the outlet of the right observation packer
1 Injection2 Observation discharge
  • Inject into the lower part of the space. Material fills it upwards.
  • Connect the observation channel to the top of the void. Its accessible outlet may be below the slab.
  • Observe material at the observation outlet, then close it and finish sealing according to the selected method.

Packers are installed in concrete beside the penetration. A longer borehole through concrete reaches the upper void zone around the pipe. Actual borehole paths and depths depend on assessed geometry, layers and access.

New illustrative visualisations. Changing penetration position does not change the volume formula; it changes sealing, injection and venting methods.

Project example — contractor's video

Supplement to the illustrations: repair of a specific penetration. Material selection and work procedure relate to the project shown.

Open “Leaking pipe penetration” on YouTube ↗