RIGID CRACK FILLING

EpoxPower

Two-component epoxy resin for rigid filling and sealing of cracks and strengthening repairs. Selection for structural bonding requires an assessment of the cause and activity of the crack.

Key parameters
Product / pumpEpoxy A + B; 1K pump after mixing
A : B ratio100 : 25 by weight (4 : 1)
Mixture viscosity350 mPa·s at 20°C
Mixture density1.10 g/cm³ at 20°C
Working / curing time at 20°C10 min / 6 h
State after reactionRigid bond; no foaming on contact with moisture

Applications and selection criteria ↓

Technical data

Read values together with the temperature, material state and test conditions.

EpoxPower — material data
Viscosity of A / B / mixture at 20°C750 / 25 / 350 mPa·s
Density of A / B / mixture at 20°C1.15 / 0.95 / 1.10 g/cm³
Compressive strengthMinimum 50 MPa
Tensile strength — designation in the TDSMinimum 15 MPa
Elongation at breakApproximately 3.5%
Application temperatureMaterial, ambient and substrate above +5°C
Working / curing time at 20°C10 minutes / 6 hours

Mechanical values describe the material; the TDS does not state the test method or specimen age for these values. They are not the design capacity of the repaired element. 6 hours of curing does not mean 6 hours are available to inject the resin.

Storage and shelf life
+5 to +30°C; 12 months in the original, unopened packaging.

Applications and selection criteria

First establish the repair objective, substrate condition, presence of water and joint movement.

01

Rigid filling of a concrete crack

Assess the structure and the cause of cracking. The filling is intended to act as a rigid connection; force transfer and repair acceptance are defined by the design.

02

Dry and slightly damp substrates

The TDS covers dry cracks and moisture tolerance without foaming. Where water flows through a crack, first address the ingress and surface preparation.

03

Strengthening fills in masonry and structures

The scope of the TDS includes stabilising and strengthening injections. Match viscosity and the delivery path to the pores, voids and substrate condition.

Application conditions and limitations

EpoxPower forms a rigid filling. Do not select it as a flexible seal for an active movement joint or for automatic accommodation of further crack movement. Eliminating the cause of damage and checking the repair remain part of the structural task.

How the material behaves

Dry cracks; moisture tolerance does not mean application in active flow. Rigid filling; do not extend selection to a moving expansion joint.

1. Preparation

A + B at a weight ratio of 4 : 1

2. Delivery

Prepared mixture through a 1K pump

3. Result

Rigid filling after curing

After preparation and surface closure, the material is injected into the crack. Passage to subsequent points and observation of outflows help assess the filling path. Sealing and load-transferring repair remain separate objectives when selecting the system. The illustration shows the principle of the method; it is not a test result for this product.

Preparation and application

Work sequence after assessing the structure and selecting the method. Full requirements are given in the product instructions.

  1. Assess and prepare the crack

    Remove loose fragments and dirt. Drill holes, clean them with compressed air, install packers and close the crack surface in accordance with the method.

  2. Measure A and B by weight

    To 100 parts of A, add 25 parts of B. Pour B into A and mix thoroughly with a low-speed mixer. Do not replace the weight ratio with equal volumes.

  3. Prepare small batches

    Inject immediately with a 1K pump. At 20°C, the working time is 10 min; higher temperatures shorten the delivery time. Match the batch size to output and access to the injection points.

  4. Observe filling and allow to cure

    For a vertical crack, start at the lowest point. Track material passage, quantity and outflows. Curing at 20°C takes 6 h; specify the time before loading the repair in the method.

Product documentation

Data, application instructions and safety documents for the supplied material.

Preparing for safe work

Before use, read the current documentation for all supplied components. Select protective equipment, ventilation and cleaning methods appropriate to the material and equipment.