CALCULATOR · STABILISATION AND LIFTING

Foundation lifting

Determine the entry point, angle and lance length to a selected point beneath the foundation.

Need to avoid the footing or move the target outside the foundation?

Foundation wall thickness, not footing width.

Measure vertically from the surface through which the lance enters: ground or floor.

Measure vertically from the underside of the foundation (the bottom of the footing, if present) to the intended lance tip position. This is not the inclined lance length.

Where does the lance enter?

Measure depth from the floor surface.

Lance length to the underside of the foundation is the inclined section from the entry to the level of the foundation's lower surface — the underside of the footing, if present. The path may pass through soil, floor or foundation. If it meets a footing, the hole must allow the lance to pass through it into the soil below. The stated length describes the entire path from entry to that level, not just the concrete thickness to drill through.

Lance length below the foundation is the further section in the soil, to the planned final lance tip position. After passing through the foundation, the lance is advanced into the ground according to the selected method. The sum of both sections gives the total insertion depth, excluding the part above the surface.

In a lance with an ejectable tip, material is delivered at the end. In a perforated lance, it exits through holes along the perforated section. If several injection depths are planned, calculate each lance tip position separately.

Checking drilling angle and depth at the drill

DRILLING THE HOLE

How do you maintain the calculated angle?

An angle gauge (inclinometer) mounted on the drill helps control the angle during drilling. In this calculator, the angle is measured from the horizontal ground or floor. A mark on the drill bit allows drilling depth to be checked.

See angle and depth control in Knowledge →

HOW TO READ THE DIMENSIONS

One point beneath the foundation, different access paths

Lances inserted from the ground beside the wall
From the ground side
Measure the distance to the foundation underside from the lance entry level.
Lances inserted through the floor beside the wall
From the floor side
The same measurement rule: vertically from the floor surface to the foundation underside.
Where is the target point?

In both modes, the target is beneath the wall centre — halfway across its thickness. Entry distance from the wall = (depth to underside + depth below foundation) / tangent of angle − half the wall thickness. We assume that the wall and foundation share a common axis.

Standard mode uses rounded coefficients for seven angles, while visual mode uses exact trigonometric functions. This may cause small rounding differences.

The calculator determines lance insertion geometry. It does not specify lift magnitude, resin quantity, pressure or injection spacing. Select target depth and layer according to the assessed ground conditions and stabilisation design. Actual foundation shape and obstacles must be checked on site.